Quote:
Originally Posted by BendtheBar
I have been considering 1-2 heavy weeks followed by a lighter week of volume work at 50-60%.
|
I think that's a definite, and for the planned deload to be warranted the loading needs to be much more severe than what would normally be planned for. Hence the above post.